This area had some water damage that caused the top two layers of the plywood to be rotted and easily pried out with a screwdriver. Yesterday I scraped out as much of the rotted wood, exposing fresh good wood. I then applied a lot of copper green and let it dry for a day. I mixed some "Fix-It-All" with a lot of water and poured it in to the area that was scraped out. I used a trowel to level it out and let it dry. A few hours later it is pretty hard, by this weekend it should be completely solid and able to support the flooring.
I also mixed some of the same "Fix-It-All" with a lot less water and patched up the drywall on the other side of the sliding glass door.
No comments:
Post a Comment